SEH Power Outage on December 10th

December 09, 2019

There is a planned power outage scheduled for Science and Engineering Hall (SEH) on Tuesday, December 10, 2019, at 5am. Approximate duration is two hours. 

Emergency generators will operate during this outage, which may cause a minor exhaust odor in the building. Any odor should dissipate as soon as the HVAC system returns to normal operation.